Browser-only worksheet

Mission AI Readiness Worksheet

Review six conditions that shape whether an AI opportunity is ready for a bounded test. The result identifies planning strengths and gaps; it does not declare a system ready for deployment.

How it works

Rate the conditions you can support today.

Choose one response for each statement. Use “Unknown” when the answer has not been established. Honest uncertainty is more useful than an optimistic score.

Private by design: this worksheet does not submit or save answers. Keep it unclassified and non-sensitive. Do not enter CUI, proprietary data, or operational details.

01 / Mission and decision

The opportunity is tied to a real decision, workflow, user, and outcome.

We can name the mission or organizational decision this capability should improve.
The intended users and current workflow are understood well enough to test.
Success can be described as an observable outcome rather than AI adoption itself.
02 / Data and knowledge

The required information is available, usable, and bounded by clear handling rules.

We know which data or knowledge sources the capability would require.
We have an initial view of data quality, representativeness, provenance, and access.
Information-handling constraints can be reflected in a safe test environment.
03 / Technology and integration

The operating environment and integration boundaries are concrete enough to investigate.

The target infrastructure and deployment constraints are known at a useful level.
Required interfaces, systems, tools, or model dependencies have been identified.
A bounded technical path exists for testing the central assumption.
04 / Governance and authority

Ownership, oversight, and consequences of error shape the work from the start.

A responsible owner can make or sponsor the next decision.
Human review, escalation, and prohibited actions can be defined for a test.
Relevant security, legal, policy, acquisition, and authorizing stakeholders are identifiable.
05 / Evaluation and evidence

The team knows what evidence would change the decision.

The most important uncertainty or assumption can be stated plainly.
Measures and acceptance criteria can be tied to the intended use and consequence of error.
The team is prepared to document limitations, failures, and unfavorable results.
06 / People and adoption

Users, operators, sustainers, and affected stakeholders can shape the capability.

Representative users can participate in framing or evaluating the work.
Training, workflow change, maintenance, and support needs are being considered.
There is a plausible owner and path for the capability if evidence supports continuing.

Build the context

What does readiness mean beyond a score?

Read the companion guide to connect the six dimensions to mission decisions, evidence, and responsible adoption.

Read the readiness guide